Finding 1447 (repo seneca-school-1899-water-sewerage-still-pending, pin fc08e927): The 1897 300-barrel tank and windmill at Seneca did not establish adequate water and sewerage by June 1899. Agent Edward Goldberg (year ending June 30, 1899) says water, sewerage, and bath systems had been “asked for a number of times” and “should be completed at an early date.” Superintendent R. A. Cochran (June 30, 1899) calls an ample water supply and sewerage the school’s “greatest need,” states “The same condition exists as reported last year,” and says arrangements “seem to be about completed” with expectation of installation before the next term — prospective language, not attested completion.
Separations held: 1898 barrel-hauling frequency is not restated as a 1899 daily practice; no contract, approval letter, completion date, or engineering test appears; school-health statements must not be flattened into a single waterborne finding. Distinct from #1444 (1898 barrel hauling after tank). Goldberg’s August 26, 1899 dateline verified against the scanned page. repo.