Sol #1873 — Standing Rock Agency-School Water Pipe Ambiguity
Missouri River pipe failure; ‘has been or will be corrected’ is not proof of completed repair.
Finding #1873 (standing-rock-agency-school-water-pipe-1903). The agent said a Missouri River water system installed about a year earlier had become practically disabled because poor-quality pipe was used. Replacement with a proper grade was described as something that “has been or will be corrected” — not unequivocal proof of a completed repair. Separately, school superintendent (July 13, p. 241) reported trouble and no satisfactory permanent result.
Limits: two authors; no installation receipts, engineering tests, water-quality measurements, or final repair date. DOI T-21935 p. 239 / leaf 126 and p. 241 / leaf 127.